Designs & maps
Items
-
Eiserner Selbstkipper
Design of an iron tipping wagon. -
Eiserner Selbstkipper
Design of an iron tipping wagon. -
Eiserner Selbstkipper D.22103
Drawing of an iron self-reversing wagon on blue paper (scale 1:10) by Orenstein & Koppel. -
Modifications to the Transit Railway in the section... of the discharge of the first construction site
Plan of railway track modifications. -
Evacuation plan - Coast of Corinth
Evacuation plan -
Evacuation plan (14)
Evacuation plan -
Profile 3080 Sub
Cross section of the southern slope of kilometer point 3080. -
Longitudinal profile. Yellow trace
Longitudinal Section on graph paper accompanied by a handwritten note in French. -
Request for additional right of way
Drawing of part of the canal -
Ferry diagram
Diptych, titled: Ferry Diagram -
Corinth Canal.
Corinth Canal metal bridge foundations. -
Accessories K885
Component drawing -
Pipeline project from the well (elevation 9.00) to elevation 79.00 Additional construction site.
Pipeline drawing -
Project for a pipeline extending from the well (grade 9.00) to the grade (79.00) in the upper area.
Layout and longitudinal section of the Canal for a sewerage project. -
Project for the piers in Poseidonia
Poseidonia pier drawing. -
Plan of Posidonia port
Plan of Posidonia port -
Floor plan
Layout of the dock. -
Plan of the bottom of the Canal between kilometer points 3140-3170 after the removal of fallen soil and stones.
Plan of the bottom of the Canal between kilometer points 3140-3170 after the removal of fallen soil and stones. -
Gulf of Lepande
Plan of the area of the port of Posidonia in the Corinthian Gulf. -
Port of Poseidonia
Plan of Poseidonia harbor. -
Longitudinal Section 1310_20_30
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1310-20-30 in ink and colored pencil on graph paper. -
Longitudinal Section 1380_90
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1380-90 in ink and colored pencil on graph paper. -
Longitudinal Section 1400_10
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1400-10 in ink and colored pencil on graph paper. -
Longitudinal Section 1460_70
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1460-70 in ink and colored pencil on graph paper. -
Longitudinal Section 1480_90
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1480-90 in ink and colored pencil on graph paper.