-
Design of an iron tipping wagon.
-
Design of an iron tipping wagon.
-
Drawing of an iron self-reversing wagon on blue paper (scale 1:10) by Orenstein & Koppel.
-
Plan of railway track modifications.
-
Evacuation plan
-
Evacuation plan
-
Cross section of the southern slope of kilometer point 3080.
-
Longitudinal Section on graph paper accompanied by a handwritten note in French.
-
Drawing of part of the canal
-
Diptych, titled: Ferry Diagram
-
Corinth Canal metal bridge foundations.
-
Component drawing
-
Pipeline drawing
-
Layout and longitudinal section of the Canal for a sewerage project.
-
Poseidonia pier drawing.
-
Plan of Posidonia port
-
Layout of the dock.
-
Plan of the bottom of the Canal between kilometer points 3140-3170 after the removal of fallen soil and stones.
-
Plan of the area of the port of Posidonia in the Corinthian Gulf.
-
Plan of Poseidonia harbor.
-
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1310-20-30 in ink and colored pencil on graph paper.
-
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1380-90 in ink and colored pencil on graph paper.
-
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1400-10 in ink and colored pencil on graph paper.
-
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1460-70 in ink and colored pencil on graph paper.
-
Color drawing of excavation progress (Longitudinal Section) of kilometer point 1480-90 in ink and colored pencil on graph paper.